Layout and function
AMADRILL+ BAH0040-9 01.19
19
Button Button assignment Button Button assignment
Block the tramline counter
Shift on
the tramline counter
For full metering:
Block metering roller
For full metering:
Pre-metering during start-up
With valve timing gear seeder:
Calibrate the Vario gearbox with
seed rate remote control
[Blue button]
Display of fan speed
Alternative via button actuation
Display of the cultivated
part area [ha]
total area [ha]
Alternative via button actuation
(1) Display (current)
Working speed [km/h]
Tramline counter
(2) Display (current)
Spread rate [kg]
Tramline counter
Full metering display:
Metering roller speed
Valve timing gear display:
Scale position of the seed rate
remote control pointer
Fig. 15