Start-up
AMADRILL+ BAH0040-9 01.19
25
2. Insert the power cable (Fig. 19/1) into the
bracket and the 12V tractor socket.
3. Connect the bracket and the control
terminal with the power cable (Fig. 19/2).
4. Couple the seed drill or soil tillage
implement to the tractor vehicle (see
operating manual for seed drill or soil tillage
implement).
5. Route the implement cable into the tractor
cab and plug the implement plug (Fig. 19/3)
into the terminal.
Fig. 19
The implement plug is secured against
unintentional release by means of a
spring-loaded lever.
Actuate the lever before releasing the
implement plug.
5.3 Switching the control terminal on/off
Switch the control terminal on and off by pressing the button.
Enter the implement-specific data (see section "Settings", Seite 26). When the control terminal is
switched back on, the data is available again.
Before using a seed drill of a different type, enter the implement-specific data on the control terminal.
When switching on the control terminal, the software version of the control terminal briefly appears.
If the supply voltage, e.g. when starting the tractor, drops below 10 volts, the control terminal is
switched off.