Commissioning
24 Edition 03.19 qTOWER
3
/ qTOWER
3
G
6 Commissioning
Prior to commissioning, check that all requirements are fulfilled at the installation loca-
tion (see section "Installation conditions" p. 19).
6.1 Connections and control elements
1 Upper part with fluorescence-
spectrometer
2 Lock with handle
3 LED for status display
4 Lower part with thermal cycler
Fig. 3 qTOWER³ front view
2 Sample block
3 Twistlock
Fig. 4 qTOWER³, open