Training manual ALTEAS & GENUS ONE
Page. 13 of 88
Automatic calibration – Step 2:
Automatic calibration the boiler starts
this procedure to check and adjust the
calibration at 3 different powers (max,
intermediate and min); this procedure
takes some minutes (about 6 or 7
minutes).
If the calibration is finalized, the boiler goes to the
main screen and it is ready for the standard
operation.
If the calibration procedure is not completed the
display shows: “Failed” and the calibration
warning.
Repeat the procedure.
It needs to repeat this procedure in even of:
- PCB replacement;
- Electrode replacement;
- Gas valve replacement;
- Burner replacement;
- Fan replacement;
- Heat exchanger replacement;
- Exhaust/air pipes configuration modification;