EasyManuals Logo

Asus RS720Q-E9-RS8 User Manual

Asus RS720Q-E9-RS8
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
Chapter 2: Hardware Information
2-6
7. Reinstall the air duct. For more information, see the section
Air Duct
.
6. Twist each of the four screws with a screwdriver just enough to attach the heatsink to
the motherboard. When the four screws are attached, tighten them one by one in the
sequence 1, 2 then 3, 4 as shown on the heatsink to completely secure the heatsink.
The heatsink screws are T30 models. A torque value of 12 inch-lbf is recommended.
When uninstalling the heatsink ensure to loosen the four screws in the sequence 3, 4
then 1, 2 as shown on the heatsink.
1
2
3
4

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Asus RS720Q-E9-RS8 and is the answer not in the manual?

Asus RS720Q-E9-RS8 Specifications

General IconGeneral
BrandAsus
ModelRS720Q-E9-RS8
CategoryServer
LanguageEnglish

Related product manuals