Chapter 3 – Start up, adjust and measures
UM-23900B-U User manual ATEQ CDF60 Page 11/40
Chapter 3
START UP ADJUST AND MEASURES
1. STARTING THE ATEQ CDF60
The CDF60 can run with the power supply or with the internal battery.
Check the pneumatics and electrics connections before the start up of the CDF60.
Switches on the instrument.
When this is on, the battery level becoming too low
for reliable operation, the "LOW BAT" light will light
on.
The instrument starts the auto-zero cycle.
At the end of the auto-zero cycle, the instrument
indicates the current flow measured and is ready
for measurement.
.
cm
m
n
AIR STD.COND.
.
0
Note: it's important to make regularly an auto-zero cycle.