8 Operating instructions
8.1 Initial start-up
The operator must apply all applicable Safety precautions.
For the location of the air outlet valve and the drain connections, see sections Introduction
and Condensate system.
Preparations
1. Consult the sections Electrical cable size, Installation proposal and Dimension drawings.
2. The following transport fixtures, painted red, must be removed:
• Bolts or bolts and bushes under the oil separator vessel (1)
• Bolts and bushes under the gear casing (2)
• Bolt and bushes or support under the motor (3)
Instruction book
160 2920 7109 60