EasyManua.ls Logo

BEKA BEKA-MAX GIGA - Combining the Delivery Volumes for the Central Lubrication Pump GIGA PLUS

BEKA BEKA-MAX GIGA
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© BEKA 201 All rights reserved!6
...a product of BEKA
1
3
2
4
Outlet position
Outlet connection 4
Pump element
Outlet connection
sealed
2
29
H) Plug the connector (2, Fig. 30) back in.
Fig. 30:
J) Start a test run.Allow the pump to rotate until grease is discharged at the outlet without bubbles.
8.3 Combining the delivery volumes for the central lubrication pump GIGAPLUS
The delivery rates of the GIGA PLUS pump elements can be combined, provided that pump elements without pressure
limiting valve are installed.
It is possible to combine the delivery volumes of two or three pump elements and discharge them from any lubricant
outlet. The delivery volumes can also be discharged at outlet 4 (Fig. 32).
Fig. 31: Fig. 32:

Table of Contents

Related product manuals