EasyManua.ls Logo

Benning PV 1-1+ - Configuration

Benning PV 1-1+
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.3 Configuration
Operation
5290 / 06/2023 enBENNING PV 1-1+26
Procedure for PVsafety measuring lines
1. Connect the black PVsafety measuring line to the black PVtest socket of the device.
2. Connect the red PVsafety measuring line to the red PVtest socket of the device.
5.3 Configuration
5.3.1 Setting the “Auto-Power-Off”(APO) function
Procedure
1. Switch off the device.
2. Press and hold the “NULLbalance”key during the entire setting process and press the two
keys “R
PE
“ and “Auto” simultaneously.
The digital display shows “OFF” in the first line and the switch-off time (in minutes) in the
second line.
3. To increase the switch-off time, press the “V
ISO
“key (1...10min).
4. Release the “NULLbalance”key to save the settings.
5.3.2 Setting the date and the time
Procedure
1. Switch off the device.
2. Press and hold the “measured value memory”key and press the two keys “R
PE
“ and “Auto”
simultaneously.
The date and time format is displayed as follows:
MM.DD (month: 1...12, day: 1...31)
YYYY (year)
HH.mm (hours: 0...23, minutes: 0...59)
SS (seconds: 0...59)
3. Press the “R
PE
”key to select a date or time field.
As soon as the field is flashing, the value for that field can be set.
4. Press the “Save”key to increase the value or the “Measured value memory”key to
decrease the value.
Every change resets the field for the seconds to zero.
5. To save the entered values, switch off the device.

Table of Contents

Other manuals for Benning PV 1-1+

Related product manuals