34
SETTINGUP
To help you get up and running as quickly as possible, the next few pages explain how to:
1. Perform the Initial Inspection
2. Set Up the Battery
3. Attach the Probe to the Console
4. Program the Facility Name
5. Set the Date and Time
6. Load the Thermal Paper
7. Attach the Instrument to a Medical Cart (Optional)
8. Install ScanPoint with QuickPrint (Optional)
9. Watch the Onboard Tutorial
PROCEdURE 1. PERFORM THE INITIAL INSPECTION
When you receive the system, Verathon
®
recommends that an operator familiar with the instrument perform
a full visual inspection of the system for any obvious physical damage that may have occurred during
shipment.
1. Carefully open the top of the shipping box. Do not insert anything sharp through the box.
2. Remove the contents and verify that you have received the appropriate components for your system.
3. Inspect the components for damage.
4. If any of the components are missing or damaged, notify the carrier and Verathon Customer Care or your
local representative.