ENGLISH 73 / 78 CAP. 16 - TROUBLE SHOOTING
MULTIGAS 85
00
The solution is keeping to the 20
minutes vacuum time.
8. The gas scale appears
blocked on a certain value.
Loading cell locking screw
not sufficiently unscrewed.
Further unscrew the locking screw
of the cell, ensuring that it is not in
contact with the cell during use.
9. ADC converter
malfunctioning – equipment
error/not functioning.
ADC failures.
Substitution of logic electronic
board.
10. HP pressure gauge with
same pressure of internal vessel
gauge.
Dirty inside OUT “R”
solenoid valve
Failure of OUT “R”
solenoid valve
Manifold defects
Close refrigerant internal vessel,
Menu Service – Manual Activation
open OUT “R” OUT “I” OUT “A”
OUT “C” (compressor), close all
valves once a pressure of 0 bar is
reached.
Solutions could be in order:
o Clean OUT “R”
o Substitution of OUT “R”
o Substitution of manifold
11. Hoses emptying not
completed with system
under pressure
Compressor fault
First of all, check for leaks from
OUT “R”.
o Replace the compressor
12. Hoses emptying not
completed.
With pressure at 0 bar
(empty circuit)
Pressure sensor not
calibrated
First of all, check for leaks from
OUT “R”.
o Calibrate the pressure sensor
13. Initial verification not
correctly carried out.
Mistake during procedure.
Repeat pressure sensor calibration.
14. Power cut-off by pressure
switch.
o Check valve before
internal vessel blocked
o Manual valve before
internal vessel closed
o Substitute hose of check
valve
o Open manual valve