B Series Degreaser Operation
Rev G Page 81
4.5.4.2 Starting Cycle
The display must read LIFT READY as shown in Figure 4-27 below.
Figure 4-27 Lift Ready Screen
Press both START switches simultaneously to start the cycle.
4.5.5 The Cycle
Note: The timeout setpoint will be displayed for all movements. The appropriate dwell time will
be displayed for all dwells. The time remaining will start at the setpoint and count down
until the step is completed.
4.5.5.1 Cover Opens
The power cover, if equipped, will open. The display will show COVER OPENING
as shown in Figure 4-28 below.
Figure 4-28 Cover Opening Screen
4.5.5.2 Lift Descends to Vapor Level