EasyManua.ls Logo

Brother NS-10 - Attachment of Coaching Clip

Brother NS-10
211 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - 8
Main unit
Needle bar, presser mechanism / upper shaft mechanism
3 Attachment of Coaching clip
1. Bind up the lead wire of the BH switch assy. and the lead wire sub assy.
with the band 1.
2. Attach the insulator sheet 2 and the coaching clip 3 to the arm bed with
the screw 1.
3. Bind up the lead wires with the band 4.
*Key point
Refer to “Special Instructions of Wiring“
Secure the lead wire of the BH switch assy. and the lead wire
sub assy. with the coaching clip 3.
1
Torque
1.18 – 1.57 N·m
1
4 2
1
3
Screw, Bind
M4X6

Table of Contents

Related product manuals