We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
2Burner installation
3.5 Commissioning report
GE315 boilers can be operated with an oil or a gas
burner. During commissioning, carefully complete the
commissioning report for either the oil or gas burner.
z Sign all commissioning work as completed and enter
the relevant date.
Commissioning work
Page
(individual steps)
Comments
(signature)
1. Fill the heating system with water Page 33
2. Vent the heating system via radiators and air vents
3.
Leak test carried out? (only for boilers supplied in
sections)
Page 19
4. Check the location of the hot gas baffle plates
Page 36
Page 33
5. Commission the control device Page 36
6. Start up the burner See burner documentation
7. Check the flue gas temperature Page 36
8.
Inform the system user and hand over all relevant
technical documentation
9. Confirm professional commissioning
company stamp/signature/date
USER NOTE
z Enter the fuel to be used into the table
(see operating instructions "Preamble",
page 2).

Table of Contents

Other manuals for Buderus Logano GE315

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Buderus Logano GE315 and is the answer not in the manual?

Buderus Logano GE315 Specifications

General IconGeneral
BrandBuderus
ModelLogano GE315
CategoryBoiler
LanguageEnglish

Related product manuals