TE-BBR Instruction and Operation Manual
14. Reattach the bottom air line to the air cylinder and adjust the pressure regulator for the ZERO load
to obtain a free-floating condition for the shaft. Check the travel of the shaft to ensure free
movement over the entire travel of the shaft.
15. If travel is restored, use the previously removed screws to replace the Load Frame front cover,
replace the Load Frame in the bath, and continue with normal TE-BBR operations.
If the cleaning procedures have failed, contact CANNON Instrument Company for further assistance.