Greasing Points
Location Schedule Grade
1 Center pivot, front axle Every 6 Months Chassis Grease
2 Drive pedal pivot Every 6 Months Chassis Grease
3 Propeller shaft Every 6 Months Chassis Grease
4
Cutting rotary clutch lever pivot
Every 6 Months Chassis Grease
5
Cutting rotary drive shaft Every 6 Months Chassis Grease
6 Cutting rotary link pivots Every 6 Months Chassis Grease
• Grease regularly. Insufcient greasing may result in seizure or rusting, affecting
smooth operation of machine.
• When using a manual grease pump, push handle ve to six times. When handle
becomes heavy, stop pushing.
• When using a pneumatic grease pump, charge for two to three seconds.
NOTE
Greasing Points (CMX 222)