EasyManua.ls Logo

Carrier SPS - To Wire and Mount the Switch;Sensor

Carrier SPS
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Enthalpy switch/receiver and Enthalpy sensor
Carrier Sensors 51
To wire and mount the switch/sensor
For Outdoor Enthalpy Control
1 To mount the enthalpy switch/receiver, insert 2 field-supplied 8 x 3/4-in. TEK screws through its side
holes.
2 Remove the 4 screws holding the cover on, then remove cover.
3 Set the M1 to M3 jumper to M2. Leave the other jumper on Off.
4 Replace the cover and the 4 screws.
5 Connect the GND and 24 Vac terminals on the enthalpy switch/receiver to the controller's power
terminals.
6 Connect the HI or LOW terminals on the enthalpy switch/receiver to the controller's J2-6 input.
33CSENTHSW
24 Vac
secondary
24 Vac output from n/c contact when the outdoor
enthalpy is less than the indoor enthalpy
(Enable economizer)
24 Vac output from n/o contact when the indoor
enthalpy is greater than the outdoor enthalp
y
(Enable energy recycler)
HI LOW GND 24
ENTHALPY VAC
4-20 24-36
mA VDC
IN OUT
120 Vac
line
v
oltage
For Differential Enthalpy Control
1 To mount the enthalpy sensor, insert 2 field-supplied 8 x 3/4-in. TEK screws through its side holes.
2 Repeat step 1 to mount the enthalpy switch/receiver.
3 On the switch/receiver, remove the 4 screws holding the cover on, then remove cover.

Table of Contents

Related product manuals