OPM-C60/OPP-C60
System Manual
PA72P002_en
Edition: 40
Page 66 - 68
Product specific instructions
© CCV GmbH - It is not allowed to duplicate or distribute this document without our agreement.
8 CE Declation of Conformity
Please find CE Declaration Of Conformity at CCV download bar:
https://www.ccv.eu/de/service-support/businesspartner/download-bar/
9 EMV Certificates
To get the latest certifications please ask your CCV support.
10 Changelog
The system manual will be updated for relevant changes and is available for download with
the availability of the soft and/or hardware. Previous versions lose their validity.
Edition overview for this document:
Rebuilding as combination of manual and
system integrator specification
6.2.4/5.7.10 COM2 to MDB complemented
interface
text corrections
6.2.9 Complement of studs OPP-C60m(7000)
6.2 adapted interfaces
6.3 adapted Technical data
6.3 adapted Technical data
5.7.6.2 Contactless card reader installation
ferrite added.
• Extension to OPM-C60
• Technical date of SCR and COR
• Certificates adjusted
• EC-Declaration of conformity
• COR Dimensions added
• Figure for OPM-COR connection adapted
• Front cut-out for SCR-B added
• Added criteria for privacy shield
• Added cleaning information for COR
• Added current drain information about COR
• Figures for COR added
• Other short corrections
• Added steps for changing the merchant SAM
• Added notes for 4-eye activation