Cisco Nexus 9508 NX-OS - Installing or Replacing a Line Card

Cisco Nexus 9508 NX-OS
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The following table shows the results for each scenario.
ResultReserve
Power
Available
Power
Power
Supply 2
Output
Power
Supply 1
Output
Power
Requirement
Scenario
Available
power is less
than the
power
requirement
for the
switch. You
cannot power
the entire
switch (some
of the line
cards will not
be able to
power up).
3.0 kW3.0 kW5.2 kW1
Available
power
exceeds the
power
requirement
for the
switch, so the
entire switch
can power
up.
6.0 kW3.0 kW3.0 kW5.2 kW2
Setting the Power Mode
You can configure the power supply mode by using the power redundancy-mode command.
To display the current power supply configuration, use the show environment power command.
Note
Before you begin
For grid redundancy mode, the power supplies must be divided into two equal sets and installed as follows:
Slots PS 1 to PS 4 must be connected to one grid (Grid A).
Slots PS 5 to PS 8 must be connected to another grid (Grid B).
Step 1 Use the configure terminal command to enter the global configuration mode.
Example:
Cisco Nexus 9508 NX-OS Mode Switch Hardware Installation Guide
71
Managing the Switch
Setting the Power Mode