2-7
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-06
Chapter 2 Introduction to the SCE Platform
Information About The SCE Platform
SCE 2000 Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom,
photocopy the following SCE 2000 Installation Checklist. Indicate when each procedure or verification
is completed. When the checklist is completed, place it in your site log along with the other records for
your new SCE 2000 platform.
Table 2-5 SCE 2000 Installation Checklist
Task Verified By Date
Date SCE 2000 received
SCE 2000 and all accessories
unpacked
Safety recommendations and
guidelines reviewed
Topology verified: number of
SCE 2000 platforms, number of
links, and whether inline or
receive-only
Installation Checklist copied
Site log established and
background information entered
Site power voltages verified
Site environmental
specifications verified
Required passwords, IP
addresses, device names, and so
on, needed for initial
configuration available
Required tools available
Network connection equipment
available
SCE 2000 mounted in rack
(optional)
AC/DC power cables connected
to AC/DC sources and SCE 2000
platform
Console port set for 9600 baud, 8
data bits, no parity, and 1 stop bit
(9600 8N1)
ASCII terminal attached to
console port
FE management ports are
operational
GBE line and cascade ports
operational