APPENDIX C
Site Planning and Maintenance Records
This appendix includes the following sections:
• Site Preparation Checklist, on page 81
• Contact and Site Information, on page 83
• Chassis and Module Information, on page 84
Site Preparation Checklist
Planning the location and layout of your equipment is essential for successful system operation, ventilation,
and accessibility.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Table 24: Site Planning Checklist
DateTimeVerified ByPlanning ActivityTask No.
Space evaluation:
• Space and
layout
• Floor covering
• Impact and
vibration
• Lighting
• Maintenance
access
1
Cisco UCS 6200 Series Fabric Interconnect Hardware Installation Guide
81OL-24475-03