98-133966-G1 3-1
Chapter 3
3333
Installation
Installation 3
This chapter is organised in the following sections:
• Unpacking
• Site preparation
• Installation of the ADU
• Installation of the ACU
• Installation of the VMU
3.1 Unpacking
3.1.1 What’s in the box
3..1.1.1 ADU
Unpack your SAILOR 900 VSAT ADU and check that the following items are
present:
• ADU with 4 lifting brackets (already mounted)
• Package with bolts, washers and cable glands (2 sizes)
3..1.1.2 ACU
Unpack your SAILOR 900 VSAT ACU and check that the following items are
present:
• 1 x Ethernet cable (2 m)
• 1 x Ethernet cable (short)
• Power connector
• 2 x 75 Ohm coax cables F-F (1m), for Rx and Tx
• NMEA multi-connector
• Installation manual (this manual)
SAILOR900TM.book Page 1 Monday, September 16, 2013 11:01 AM