Power up
98-133966-G1 Chapter 5: Connecting power 5-5
5555
Connecting power
5.4 Power up
5.4.1 Procedure
1. Connect power to the VMU.
2. Switch on the ACU. The unit starts up and goes through an
initialization procedure:
• ACU POST
• ADU Initializing
• ADU POST
• READY
This may take some time (up to a couple of minutes).
3. The SAILOR 900 VSAT is ready to be calibrated (for first time power
up) or receive data from the VSAT modem (when in normal
operation). The ACU display shows the following message:
The LEDs Power and Fail/Pass are steady green, the LED Logon is
off. For further information on status indicators see Status signalling
with LEDs and status messages on page 8-11.
Make sure there are no hardware failures or error codes present,
check the display of the ACU for events. For more information on
error codes and events see Troubleshooting on page 8-99 and
System messages on page G-1.
4. Continue to get the SAILOR 900 VSAT system operational, do the
following:
• Make a cable loss and an azimuth calibration.
• Create VSAT modem profiles.
• Create one or more satellite profiles.
For step-by-step instructions, see Introduction to the built-in web
interface on page 6-1.
For installation check lists see, Installation check on page 7-1.
Figure 5-3: ACU display after first power on (example with LAN ports 1 and 4 used)
Steady
green
SAILOR900TM.book Page 5 Monday, September 16, 2013 11:01 AM

Table of Contents