EasyManua.ls Logo

Convotherm OEB 10.10 - Page 66

Default Icon
144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting up the combi steamer
Installation manual 65
Installing the gas supply
Follow the steps below to provide the gas supply for your combi steamer:
Step Action
1
Measure the supply flow pressure.
2 Compare the type of gas, the gas pressure and the rating for the gas supply connection with the data
given on the appliance type plate.
3
Fit a pressure reducer if the supply flow pressure is too high.
4
Connect the gas supply.
5 Check that all connections inside and outside the appliance are sealed (e.g. using gas detector or
leak locator spray).
Caution
Do not spray leak locator spray on the flame-monitor electrical leads.
6
Inform the user that the gas components must be serviced annually.
7 Check the flue-gas values against the figures given in the "Gas valve installation instructions" held in
the wiring compartment.
Carry out a flue gas analysis.
Check that the analysis values lie within the permitted flue gas values given in the table above.
Record the measurements in the appliance.
8
Once the gas installation is finished, close the gas shut-off device.
Flue gas value records
You can use the table below to keep records of flue gas values:
O
2
λ
CO
2
CO Gas type
[%]
[%] [ppm]

Table of Contents

Other manuals for Convotherm OEB 10.10

Related product manuals