Project PlanningProject Planning
The following is a typical program and timetable for a Panel installation project, once the
initial order has been received:
1. Project Meeting
Installer and user to be present; system specifications, schematic diagram and
proposed circuit drawing to be available. Panel Installation & Commissioning
Guide to be provided.
2. Equipment Fix
Typically 2 week's notice is required for equipment to be delivered. Cable to be
installed and bases/back boxes to be fitted. Then fire detectors, call points, alarm
sounders, isolator units and interface units to be installed.
3. Address Schedule
Schedule of sensor locations to be completed by installer and returned to enable
System programming.
4. Auto Learn
Fire panel/repeater panels to be installed and terminated. System to be powered
up by installer and auto learn mode activated (see Auto Learn section). System
to be tested and verified by installer, prior to final commissioning.
5. Final Commissioning
Minimum 2 weeks notice is required from receipt of Address Schedule and
Commission request form. Cooper Lighting Service Engineer to attend site
implement/oversee the final commissioning procedures (see Commissioning
section), in conjunction with the installer.
The following is a typical program and timetable for a Panel installation project, once the
initial order has been received:
Installer and user to be present; system specifications, schematic diagram and
proposed circuit drawing to be available. Panel Installation & Commissioning
Guide to be provided.
Typically 2 week's notice is required for equipment to be delivered. Cable to be
installed and bases/back boxes to be fitted. Then fire detectors, call points, alarm
sounders, isolator units and interface units to be installed.
Schedule of sensor locations to be completed by installer and returned to enable
System programming.
Fire panel/repeater panels to be installed and terminated. System to be powered
up by installer and auto learn mode activated (see Auto Learn section). System
to be tested and verified by installer, prior to final commissioning.
Minimum 2 weeks notice is required from receipt of Address Schedule and
Commission request form. Cooper Lighting Service Engineer to attend site
implement/oversee the final commissioning procedures (see Commissioning
section), in conjunction with the installer.
1. Project Meeting
2. Equipment Fix
3. Address Schedule
4. Auto Learn
5. Final Commissioning