Figure 6-4 System Configuration Parameters
IMPORTANT!
Please check with your local electrical utility before selecting a Grid
Code. If the PCS is operated with a wrong Grid Code, the utility
may cancel the interconnection agreement.
Placing the PCS into operation before the overall system complies
with the national rules and safety regulations of the application is not
permitted.