PRE-INSTALLATION CHECKLIST
Check that the inverter environmental specifications (protection degree,
operating temperature range, humidity and altitude, etc) meet the
requirements of the specific project location.
Make sure that the electric utility grid voltage is within range for the grid
standard chosen.
Ensure that the local electric utility grid authority has granted permission
to connect to the grid.
Installation personnel must be qualified electricians or those who have
received professional training.
Wear and use proper PPE (personal protective equipment) during
installation.
Sufficient space according to Figure 3-3 and Figure 3-4 must be
provided to allow the inverter cooling system to operate effectively.
Install the inverter away from flammable and/or combustible substances.
Avoid installing the inverter in locations that exceed the temperature
limits specified for the inverter to prevent undesirable power loss.