EasyManua.ls Logo

CPS SCA Series - Before You Start

Default Icon
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
Before You Start…
Scope
This Installation and Operation manual contains important information, safety
guidelines, detailed planning and setup information for installation, as well as
information about configuring, operating and troubleshooting the CPS SCA 25
KTL-DO/US-208CPS SCA50KTL-DO/US-480 and CPS SCA 60KTL-DO /US-
480 3-Phase String Inverters. Here after in this manual this equipment may be
referred to simply as the inverters. Be sure to read this manual carefully before
operating or servicing the inverters.
Audience
The information in Chapters 1 Overview, 4User Interface, 6Main Menu and
Operation, 7 Faut Shutdown and troubleshooting, and 9 Accessories is
intended for the owner and operator of the inverter, and does not require any
special training or qualifications. The information in Chapters 0 Installation, 5
Commisionning, 8Maintenance and De-installation is intended for qualified
personnel only. Qualified personnel have training, knowledge, and experience
in:
Installing electrical equipment and PV power systems (up to 1000VDC).
Applying all local installation codes.
Analyzing and eliminating the hazards involved in performing
electrical work.
Selecting and using Personal Protective Equipment (PPE).

Table of Contents

Related product manuals