72
7. Choose PV Input working mode. The factory default working mode of the
DC input connection and MPP Tracker is set for Independent. Contact
CPS if parallel mode is required.
Figure 5-5 Independent Mode Setting
8. Neutral Line Setting. From the previous menu, press ESC to return to the
System Parameters menu. Select Neutral Line Setting and press ENT.
Use the arrow keys to highlight “Yes” or “No” in regard to whether a
neutral conductor is present. Press ENT.
This setting will allow the inverter to display L-N voltages on the LCD. It
will not affect the operation of the inverter.
Neutral Line Setting
No
Yes
Figure 5-6 Setting the Neutral Line