25
99-04-23
CHAPTER 4
Installation
This chapter describes how to:
Design a Workcell
Unpack the Arm
Prepare a Mounting Platform
Mount the Arm on the Platform
Ground the Arm
Connect the Umbilical Cables to the Arm
Arm or Controller First?
You can install the arm first or the controller first. This chapter covers installation
of the arm. A similar chapter in the controller user guide covers installation of the
controller.
Gripper
Gripper installation is covered separately in a later chapter. Before attaching the
gripper to the arm, the arm and controller must be installed and commissioned.