EasyManua.ls Logo

Daikin 10 - Page 5

Daikin 10
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
8
Disassembling Procedure ……… 118
1. AKZ14A–43A …………………………………… 118
2. AKZ56A, 90A …………………………………… 133
9
Replacement Procedure ………… 149
1. Replacing Control Board ……………………… 149
2. Procedure for Replacing EEV (for main circuit)
and MOV (for hot gas) ……………………… 150
10
Miscellaneous Reference Data 151
1. Characteristics of Refrigerant R410A ……… 151
2. Procedure for Mounting Optional Parts ……… 153
2-1.
Machine Body Thermistor/
Returned Oil Thermistor (Optional)
…… 153
2-2. Communication Board (Optional) …… 154
3. Notes on Installation …………………………… 155
3-1. Installing Location and Oil Piping …… 155
3-2. Suction Strainer (Line Filter) ………… 155
3-3. Oil Tank ………………………………… 155
4. Electric Wiring Work …………………………… 156
4-1.
Starting/stopping the Oil Cooling Unit
156
4-2.
Mounting a Ground Leakage Circuit Breaker
157
4-3. Wiring procedure ……………………… 157
4-4. Switch Box Outline …………………… 158
4-5. Connecting Remote-control Operation
Input …………………………………… 159
4-6.
Connecting External Output Contact
…… 159
5. Maintenance and Inspection ………………… 161
5-1. Daily Maintenance and Inspection …… 161
5-2.
Periodic Maintenance and Inspection
…… 161
5-3.
To leave the unit unused for a long period
162
OIL COOLING UNIT(MODEL 10) Service Manual
The specifications and others of this Service Manual are subject to change
without notice for product improvements.
It is prohibited to copy or divert the contents of this manual, or distribute
them over networks without our permission.
00_PB00540A_M10.indb 2 2023/08/09 12:58:50

Table of Contents

Related product manuals