EasyManua.ls Logo

Daikin VHF - Start Form

Daikin VHF
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Job Name _________________________________________________________ Check, Test & Start Date ________________
City or Town __________________________________________ State _________________________ Zip ________________
Who is Performing CTS _____________________________________
Equipment Type (Check all that apply)
General Contractor _________________________________________
Essential Items Check of System – Note: “No” answers below require notice to installer by memorandum (attached copy.)
Closed Loop
Open Loop
Geothermal
Other (specify)______________
Water Source Heat Pump Equipment Check, Test and Start Form
Essential Items Check
A. Voltage Check __________ Volts Loop Temp. ___________ °F Heating System Water P.H. Levels __________
Set For ___________ °F Cooling
B. Yes No Condition Comments
Loop Water Flushed Clean _________________________________________________________________
Closed Type Cooling Tower _________________________________________________________________
Water Flow Rate to Heat Pump Balanced ______________________________________________________
Standby Pump Installed ___________________________________________________________________
System Controls Functioning _______________________________________________________________
Outdoor Portion of Water System Freeze Protected ______________________________________________
Loop System Free of Air ___________________________________________________________________
Filters Clean ____________________________________________________________________________
Condensate Traps Installed _________________________________________________________________
Note: “No” answers below require notice to installer by memorandum (attached copy.)
Outdoor Air to Heat Pumps: ________________________________________________________________
Other Conditions Found: ___________________________________________________________________
This form must be completed and submitted within ten (10) days of start-up to comply with the terms of the Daikin warranty. Forms should
be returned to Daikin Warranty Department.
Installation Data
Please include any suggestions or comments for Daikin Applied: ___________________________________________________
______________________________________________________________________________________________________
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Above System is in Proper Working Order
Note: This form must be lled out and sent to the warranty administrator
before any service money can be released.
Date
Signature for Sales Representative
Signature for Customer
For Internal Use
Release:
SM ________________________
CTS ________________________
T ________________________
Service Manager Approval
Date
Form WS-CTS-00.01 (Rev. 4/14)
www.DaikinApplied.com 58 Vertical Stack WSHP • IM 986-11

Table of Contents

Related product manuals