6. Find the motor terminals. The location of the terminals is different than usually, especially in MR8.
L1
U V W
L2
L3 DC-
DC+
R+
R-
e30bh249.10
6.5 Installation of Cables
6.5.1 Additional Instructions for Cable Installation
Before starting, make sure that none of the components of the AC drive is live. Read carefully the warnings in Safety section.
Make sure that the motor cables are sufficiently far from other cables.
The motor cables must go across other cables at an angle of 90°.
If it is possible, do not put the motor cables in long parallel lines with other cables.
If the motor cables are in parallel with other cables, obey the minimum distances (see table 15).
The distances are also valid between the motor cables and the signal cables of other systems.
The maximum lengths of shielded motor cables are 100 m/328 ft (for MR4), 150 m/492 ft (for MR5 and MR6), and 200 m/656 ft (for
MR7, MR8, and MR9).
If the cable insulation checks are necessary, see
8.3 Measuring the Cable and Motor Insulation.
Table 15: Minimum Distances between Cables
The distance between ca-
bles [m]
The length of the shielded cable
[m]
The distance between ca-
bles [ft]
The length of the shielded cable
[ft]
0.3 ≤ 50 1.0 ≤ 164.0
1.0 ≤ 300 3.3 ≤ 656.1
Electrical Installation
Operating Guide | VACON® 100 Wall-mounted Drives
AQ298036140958en-000101 / DPD01711| 43