23-11 Maintenance Action
Array [20]
Option: Function:
Select the action to be associated with
the
Preventive Maintenance Event.
[1] Lubricate
[2] Clean
[3] Replace
[4] Inspect/Check
[5] Overhaul
[6] Renew
[7] Check
[20] Maintenance Text 0
[21] Maintenance Text 1
[22] Maintenance Text 2
[23] Maintenance Text 3
[24] Maintenance Text 4
[25] Maintenance Text 5
23-12 Maintenance Time Base
Array [20]
Option: Function:
Select the time base to be associated with the
Preventive
Maintenance Event.
[0] Disabled
[0] Disabled must
be used when disabling the
Preventive Maintenance Event.
[1] Running
Hours
[1] Running Hours is
the number of hours the
motor has been running. Running hours are
not reset at power-on. The Maintenance Time
Interval must be specified in
23-13 Maintenance Time Interval.
[2] Operating
Hours
[2] Operating Hours is
the number of hours the
frequency converter has been running.
Operating hours are not reset at power-on.
The Maintenance Time Interval must be
specified in 23-13 Maintenance Time Interval.
[3] Date & Time
[3] Date & Time uses
the internal clock. The
date and time of the next maintenance
occurrence must be specified in
23-14 Maintenance Date and Time.
23-13 Maintenance Time Interval
Array [20]
Range: Function:
1 h* [1 -
2147483647
h]
Set the interval associated with the current
Preventive
Maintenance Event. This
parameter is only used if [1] Running Hours
or [2] Operating Hours is selected in
23-12 Maintenance Time Base. The timer is
reset from 23-15 Reset Maintenance Word.
Example:
23-13 Maintenance Time Interval
Array [20]
Range: Function:
A Preventive Maintenance Event is set up
Monday
at 8:00. 23-12 Maintenance Time
Base is [2] Operating hours and
23-13 Maintenance Time Interval is 7 x 24
hours=168 hours. Next Maintenance Event
will be indicated the following Monday at
8:00. If this Maintenance Event is not reset
until Tuesday at 9:00, the next occurrence
will be the following Tuesday at 9:00.
23-14 Maintenance Date and Time
Array [20]
Range: Function:
Size
related*
[ 0
-
0 ]
Set the date and time for next maintenance
occurrence if the Preventive Maintenance
Event is based on date/time. Date format
depends on the setting in 0-71 Date Format
while the time format depends on the
setting in 0-72 Time Format.
NOTE
The frequency converter has no back up
of the clock function and the set date/
time will reset to default (2000-01-01
00:00) after a power down. In 0-79 Clock
Fault it is possible to program for a
Warning in case the clock has not been
set properly, e.g. after a power down.
The time set must be at least one hour
from the actual time!
NOTE
When
mounting an Analog I/O MCB 109
option card, a battery back up of the
date and time is included.
3.18.4 23-1* Maintenance Reset
23-15 Reset Maintenance Word
Option: Function:
Set this parameter to [1]
Do reset to reset the
Maintenance Word in 16-96 Maintenance Word
and reset the message displayed in the LCP.
This parameter will change back to [0] Do not
reset when pressing [OK].
[0] * Do not
reset
[1] Do reset
Parameter Description
VLT
®
Refrigeration Drive Programming Guide
144 MG16H102 - VLT
®
is a registered Danfoss trademark
33

Table of Contents

Other manuals for Danfoss VLT FC 103

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Danfoss VLT FC 103 and is the answer not in the manual?

Danfoss VLT FC 103 Specifications

General IconGeneral
BrandDanfoss
ModelVLT FC 103
CategoryDC Drives
LanguageEnglish

Related product manuals