EasyManua.ls Logo

Dodge Ram 2004 - Page 120

Dodge Ram 2004
642 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TEST ACTION APPLICABILITY
10 NOTE: Reconnect the PCM/ECM harness connector and the negative bat-
tery cable.
Turn the ignition on.
Measure the voltage of the PCI Bus circuit at the Data Link Connector (DLC).
Is the voltage above 7.0 volts?
All
Yes Go To 11
No Test Complete.
11 Turn the ignition off.
Using a voltmeter, connect one end to the PCI Bus circuit at the DLC, and the other
end to ground.
Note: When performing the next step turn the ignition off (wait one minute)
before disconnecting any module. When the module is disconnected turn
the ignition on to check for a short to voltage.
Turn the ignition on.
While monitoring the voltmeter, disconnect each module the vehicle is equipped with
one at a time.
Is the voltage steadily above 7.0 volts with all the modules disconnected?
All
Yes Repair the PCI Bus circuit for a short to voltage.
Perform BODY VERIFICATION TEST - VER 1.
No Replace the module that when disconnected the short to voltage
was eliminated.
Perform BODY VERIFICATION TEST - VER 1.
106
AIRBAG
NO PCI LOOPBACK Continued

Table of Contents

Related product manuals