EasyManua.ls Logo

Eaton 9130 - Page 21

Eaton 9130
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
M6 16 Pan-Head
Screws (6 places)
Front of Rack
M6 Cage Nuts
(6 places)
Tighten
adjustment
screws after rail attachment
(3 places each rail).
Position 4
Position 1
Installation
Eaton 9130 700/3000 VA UPS User’s Guide 164201718—Rev 7 www.eaton.com/powerquality 15
Figure 5. Securing the Rails
5. Repeat Steps 3 and 4 for the other rail assembly.
6. Tighten the three adjustment screws in the middle of eac
h rail assembly.
7. If installing optional cabinets, repeat Step 1 through Step 6 for each rail kit.
8. Place the UPS on a flat, stable surface with the front of the cabinet facing you.
9. Align the mounting brackets with the screw holes on each side of the UPS and secure with the supplied
M4x
8 flat-head screws (see Figure 6).
NOTE There are two sets of four mounting holes on each side of the UPS: a forward
position and a middle position. Choose the position that meets your configuration
needs.
Mounting
Bracket
M4 8 Flat-Head
Screws (4 places)
Figure 6. Installing the Mounting Brackets (Forward Position Shown)
10. If installing optional cabinets, repeat Steps 8 and 9 for each cabinet.
11. Slide the UPS and any optional cabinets into the rack.
12. Secure the front of the UPS to the rack using two M6x16 pan-head screws and two M6 cage nuts on each
side (see Figure 7). Install the bottom screw on each side through the bottom hole of the mounting
brac
ket and the bottom hole of the rail.
Repeat for any optional cabinets.

Table of Contents

Other manuals for Eaton 9130

Related product manuals