EasyManua.ls Logo

Eaton Power Xpert 9395 - Table 3-3: Air Conditioning or Ventilation Requirements During Full Load Operation; Figure 3-1. UPS Cabinet Dimensions (Front View)750-1100 Kva (750-900 Kva Does Not Include UPM4)

Eaton Power Xpert 9395
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P-164000477 9395P750 kVA / 900 kVA and 1000 kVA / 1100 kVA 13
Revision 002 User’s and Installation Guide
Table 3-3: Air conditioning or ventilation requirements during full load operation
Ventilation required for cooling air exhaust: approximately 920 liter/sec/250-300kVA unit, + 560 liter/sec
(ISBM).
Figure 3-1. UPS cabinet dimensions (front view)750-1100 kVA (750-900 kVA does not include UPM4)
Rating
Heat rejection
kW
Heat rejection
BTU / h x 1000
750 kVA 29.5 100.7
900 kVA 38.5 131.3
1000 kVA 39.1 133.8
1100 kVA 51.5 175.6
A 736 (UPM 4)
B 1704 (Cust. 1/0 + ISBM)
C 1872 (UPM 1-3)
AB C

Table of Contents

Other manuals for Eaton Power Xpert 9395

Related product manuals