P-164000477 9395P750 kVA / 900 kVA and 1000 kVA / 1100 kVA 21
Revision 002 User’s and Installation Guide
• To allow for future kVA upgrades, consider using conductors sized for non-derated units to wire
derated units.
• Material and labor for external wiring/busbar requirements are to be provided by designated
personnel.
• Specification is for copper wire with a 90°C rating.
• The bypass feed into this equipment uses three or four wires. The rectifier feed into this
equipment uses three wires. The phases must be symmetrical about ground (from a Wye source)
for proper equipment operation.
• If the load requires a neutral, a bypass source neutral must be provided. If the load does not
require a neutral and there is no neutral conductor connected at the bypass input, a neutral must
be installed to source star point.
• This UPS system can be installed to the TN, TT or IT power distribution systems.
Additional warning labels, shown in Figure 5-15, shall be installed at the UPS input terminals
and all primary power isolators used to isolate the UPS unit if:
• the UPS system is installed to an IT power distribution system
• or the UPS input is connected through external isolators that, when opened, isolate the
neutral connection.
• These warning labels can be obtained from your local service representative.
• The UPS cabinet is shipped with a debris shield covering the ventilation grill on top of the unit. Do
not remove the debris shield until installation is complete. However, remove the shield before