ecom-ST 1.0 21
3. Starting Up
1. Connect the gas sampling system to the device.
2. Connect the gas sampling system to the extraction point.
3. Connect the power supply unit.
4. If necessary, connect hose for fresh air supply (AIR-IN Gas
processing module).
5. Connect hose for condensate evacuation disposal.
6. Switch on the device.
4. Measurement Procedure
4.1 Preparation
After switching on the device, the start screen
is shown on the display and then the main
menu. In the main menu 4 submenus are
displayed.
Prior to each measurement, make sure that:
• the device has no visible defects.