Figure 2
Turbomolecular pump start delay with XDD1 diaphragm pump
Connect a vacuum gauge
A single compable acve gauge can be ed to the T-Staon 85.
Fit the gauge using an Edwards acve gauge cable into the gauge connector located on the side
of the controller housing (refer to Figure 1 on page 10, item 6). For acve gauge control and set
up refer to Gauge screen on page 19.
The following Edwards acve gauges are suitable for use with the T-Staon 85:
• APG100 Acve Pirani vacuum gauge
• APGX
-H Acve Linear Convecon gauge
• AIM-X Acve Inverted Magnetron gauge
• ASG Acve Strain gauge
Commission the installaon
Aer installing the T-Staon 85, the system must be tested.
Use the following procedure to test the system:
1. Make sure that all the electrical connecons are secure.
2. Switch on the electrical supply and the exhaust extracon system (if available).
3. To operate the system press the START/STOP key. Check that the equipment operates
as described in .
4. Check that the turbo pump reaches normal speed. If the pump inlet is valved or
capped o, it should take approximately 100 - 150 seconds for the turbo to reach
normal speed. If a vacuum chamber is aached to the pump inlet, this me may take
longer.
5. To turn OFF the system, press the START/STOP key followed by the ENTER key to
conrm. Check that the equipment closes down as described in .
For full operaonal details and how to navigate using the front panel control key pad refer to
Menu structure on page 17.
D395-94-880A - Installaon
Page 15