EasyManua.ls Logo

Elliott Digger Derrick - Road Transport

Default Icon
376 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Road Transport EEC-0051 V1.1
Road Transport
Make sure outriggers/stabilizers are retracted and removable pads stowed-if
applicable. Always retract optional front bumper stabilizer before retracting
outriggers and stabilizers.
Secure the loadline, headache ball or hook block to travel attach point.
Boom must be in boom rest and turret locked for optional turret locks.
Secure all items on the truck bed.
Make sure jib-if supplied-is stowed properly and pinned to boom.
Disengage the PTO.
Perform DOT pre-trip inspection.
Release park brake.
Know the weight of the vehicle and items transported on deck. Do not exceed
axle limits and bridge load limits.
Know overall height and make sure there is clearance before entering
underpasses and other overhead obstructions.

Table of Contents