EasyManua.ls Logo

Endress+Hauser Proline Promag 55 - Potential equalization

Endress+Hauser Proline Promag 55
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Block BASIC FUNCTION Device Functions Proline Promag 55 FOUNDATION Fieldbus
52 Endress+Hauser
7.4.2 Function group OPERATION
BASIC FUNCTION G FOUNDATION FIELDBUS GGA
PROCESS PARAMETER GIA
SYSTEM PARAMETER GLA
SENSOR DATA GNA CONFIGURATION 680
OPERATION 682
Function description
BASIC FUNCTION SENSOR DATA OPERATION
All sensor data (measuring period, overvoltage time, etc.) are set at the factory and saved on the S-DAT (sensor memory
chip).
" Caution!
Under normal circumstances you should not change the following parameter settings, because changes affect numerous
functions of the entire measuring facility in general and the accuracy of the measuring system in particular. For this
reason, the functions described below cannot be changed even when you enter your private code.
Contact the Endress+Hauser service organization if you have any questions about these functions.
MEASURING PERIOD
(6820)
Use this function to view the measuring period. The duration of the measuring period is
calculated from the rise time of the magnetic field, the brief recovery time, the integration
time and the empty pipe detection time.
User interface:
Max. 4-digit number: 10 to 1000 ms
Factory setting:
Depends on nominal diameter
EPD ELECTRODE
(6822)
Use this function to check whether the sensor is equipped with an EPD electrode.
User interface:
YES
NO
Factory setting:
YES Electrode fitted as standard

Table of Contents

Other manuals for Endress+Hauser Proline Promag 55

Related product manuals