Endress+Hauser
Brief overview
!
Note!
These Operating Instructions describe the installation and initial commissioning of the point level
switch. It considers all of the functions that are necessary for a usual measuring task.
For quick and easy commissioning:
Safety instructions
Explanation of the warning symbols
For special instructions, refer to the corresponding location in the respective
chapter. The priority is indicated by the Warning #, Caution " and Note !
symbols.
ä 8
Installation
This section describes the required steps when installing the device and the
installation conditions (such as dimensions).
ä 15
Wiring
The device is shipped, for the most part, completely wired and ready to plug in. ä 36
Display and operating elements
This section provides an overview of the arrangement of the display and
operating elements of the device.
ä 49
Commissioning
The "Commissioning" chapter shows you how to switch on the device and
check its functions.
ä 53
Troubleshooting
If faults occur during operation, use the checklist to find the reason.
This section lists measures you can take yourself to remedy any faults that may
occur.
ä 78