Section 3 Transport Commissioning and Operation
Description Page No.
3.1 Transport 2-3
3.2 Pre-Start Instructions 4
3.3 Machine Starting Sequence 5
3.4 Stopping the Machine 6
3.5 Tracking (Moving Procedures) 7-8
3.6 Preparing the Machine for Operation 9-16
3.7 Operating the Machine
17-18
Contents
Section 3 Page 1
E-7
3.1 Transport
This machine must only be transported between sites on a suitable Low Loader.
The machine must be tracked onto and off the trailer. See section - Tracking.
Note This equipment must never be tracked on gradients that are more than:-
10 degrees Port to Starboard or 20 degrees Front to Back.
The machine must always be on flat, solid ground when operating in its
normal mode.
Ensure the Loading/Unloading site is clear of non essential personnel. Barrrier
the area and post warning signs where site conditions warrant this.
Loading/Unloading must only be carried out on firm flat ground.
The operator must be fully trained in the operation of this equipment.
When tracking the operator must be in a position to have an all round view of the
operation, a banks man or marshal should assist where this is not possible.
The total weight of this machine is - 28 000Kg
Machine Transportation
Ensure that Feeder Doors, Side conveyors and Tail conveyor are folded and that
Feeder is lowered and locked with the in-fill panels removed prior to transportation.
Before Transporting on the road. The load dimensions must be checked to ensure
that they are within the legal transport limits. (See Diagram on following page for
machine transport dimensions)
Section 3 Page 2