Section 4 Maintenance
Description Page No.
4.1 Introduction 2
4.2 Daily Maintenance Schedule 3-4
4.3 Weekly Maintenance Schedule 5-9
4.4 Maintenance Schedule Every 250 Hrs 10
4.5 Maintenance Schedule Every 1000 Hrs 11-12
4.6 Tensioning and Tracking Belts 13-16
4.7 Screen Mesh Replacment 17-18
4.8 Trouble Shooting Guide 19
Contents
Section 4 Page1
E-7
4.1 Introduction
Refill if necessary.Check engine oil level.
(Refer to the engine manufacturers handbook for engine oil specifications.)
Check fuel level. If necessary refill diesel
tank. Use standard diesel as suitable for the
operating climate.
MACHINE MAINTENANCE
Maintenance is essential for safety and to ensure the best possible performance from your E-7 by
reducing the chances of breakdowns.
WARNING: -
The machine
MUST
be switched off and Isolated with the ignition keys removed
BEFORE
making any adjustments.
DO NOT stand on any part of the engine whilst operating or carrying out any maintenance on the
machine.
All adjustments must
ONLY
be carried out by trained personnel.
All adjustments to modify hydraulic system must ONLY be carried out by trained Extec service
engineers.
When performing any maintenance on the machine refer to engine and feeder gearbox
manufacturers handbooks for appropriate maintenance schedules.
4.2 DAILY MAINTENANCE SCHEDULE
O
i
l
C
a
p
Fue
l
Le
v
e
l
F
u
el
C
a
p
Bleed diesel water trap
Section 4 Page2