Observe the following when mounting this device:
• Two people are required to install the device in a rack. One person should hold the device, while the other screws in the front
and rear brackets
• Before mounting your device, review any specic installation and facility requirements in the Hardware Installation Guide for the
device.
• Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing in the
rack.
Time and items required
Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Two-Post Rack Kit:
• #2 Phillips torque screwdriver
• 1/4-inch slotted-blade torque screwdriver
Parts list
The following parts are provided with the Universal Two-Post Rack Kit Installation (XBR-R000294).
Installing the Universal Two-Post Rack Kit (XBR-R000294)
ExtremeSwitching VDX 6740 Hardware Installation Guide
9036108-00 75