EasyManua.ls Logo

Farm King RT10 - Three-Point Hitch

Farm King RT10
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation - RT10
25
Three-Point Hitch
Move the tractor drawbar into the storage position
or remove (if necessary) to prevent interference
with operation (see the tractors operators manual
for the correct procedure).
Figure 16
Remove the top implement mounting pin (Item 1)
and lynch pin from the equipment [Figure 16].
Remove the lynch pins from the left and right lower
mounts (Item 2) [Figure 16].
Move the tractor backwards, aligning the tractors
three-point hitch and equipment’s three-point
mounts.
Install the left and right lower three-point mounts
of the tractor to the equipment’s left and right
lower mounting pins.
Reinstall the lynch pins.
Lower the top link of the three-point hitch until it
aligns with the equipment’s upper mount.
Reinstall the mounting pin and lynch pin.
NOTE: It may be necessary to lengthen or shorten
the top link to align it with the equipment’s
mounting hole (see the tractors operators
manual for the correct procedure).
The equipment can be leveled front to back by
adjusting the top link (see the tractors operators
manual for the correct procedure).
Adjust the lower link sway chains or blocks on the
tractor to restrict side movement of the equipment
when operating.
IMPORTANT
Always use a hitch pins of adequate size and
strength and a retaining pin with a locking
device.
Figure 17
Remove the retaining pin and slide the support leg
(Item 1) up into the storage position. Reinstall the
retaining pin at the lower hole on the leg [Figure 7].
1
1
2
2

Table of Contents

Related product manuals