2. Preparing for commissioning
2-2
Festo CPX-FB36-EN en 1611a English
Contents
2. Preparing for commissioning 2-1.....................................
2.1 EtherNet/IP protocol 2-3............................................
2.1.1 “Multicast” telegram 2-3.....................................
2.1.2 “QuickConnect” 2-5.........................................
2.1.3 “Device Level Ring” protocol (DLR) 2-8.........................
2.2 Modbus® TCP protocol 2-10..........................................
2.3 Notes on commissioning of the CPX-FB36 2-11...........................
2.3.1 Requirements for commissioning 2-11...........................
2.3.2 Switching on the power supply 2-12............................
2.3.3 Normal operating status 2-12..................................
2.4 Participants in the network 2-16.......................................
2.4.1 Participant properties (EDS file) 2-16............................