EasyManua.ls Logo

Festo CPX-FB36 - Page 6

Festo CPX-FB36
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents and general instructions
IV
Festo CPX-FB36-EN en 1611a English
2. Preparing for commissioning 2-1.....................................
2.1 EtherNet/IP protocol 2-3............................................
2.1.1 “Multicast” telegram 2-3.....................................
2.1.2 “QuickConnect” 2-5.........................................
2.1.3 “Device Level Ring” protocol (DLR) 2-8.........................
2.2 Modbus® TCP protocol 2-10..........................................
2.3 Notes on commissioning of the CPX-FB36 2-11...........................
2.3.1 Requirements for commissioning 2-11...........................
2.3.2 Switching on the power supply 2-12............................
2.3.3 Normal operating status 2-12..................................
2.4 Participants in the network 2-16.......................................
2.4.1 Participant properties (EDS file) 2-16............................
3. Commissioning 3-1................................................
3.1 Configuration 3-3..................................................
3.1.1 Configuration with EDS file 3-4................................
3.1.2 Configuration with “Generic Ethernet Module” 3-11................
3.1.3 Configuration with CPX-FMT 3-16...............................
3.1.4 Configuration in the “Remote Controller” operating mode 3-20.......
3.1.5 Setting up a “Listen only” connection 3-21.......................
3.2 Parameterisation 3-22...............................................
3.2.1 Parameterisation during switch-on [system start] 3-23..............
3.2.2 Methods of parameterisation 3-25..............................
3.2.3 Parameterisation via configuration data 3-26.....................
3.2.4 Parameterisation with the control device CPX-MMI 3-26............
3.2.5 Parameterisation in the PLC user program 3-26...................
3.2.6 Parameterisation using CPX-FMT and system start with saved parameters
3-27
3.3 Behaviour of the outputs in the “Fail safe mode” or “Idle mode 3-28.........
3.4 Web server 3-29....................................................
3.5 Checklist for commissioning a CPX terminal 3-30..........................
3.6 Replacing the bus node 3-31..........................................

Table of Contents

Other manuals for Festo CPX-FB36

Related product manuals