Programming
© Festo Didactic GmbH & Co. • MPS 113
Please test the input/output-communication with a program. Complete the drawing
shown in the Execution step first.
Information
Please use only one program FC1 in FBD which starts without any condition to solve
this problem. Edit with symbols. Use the list of inputs and outputs from project 1.3
to find necessary informations. The OB1 is in STL. Don´t use an actuator or an input
twice. Fill out all c in the drawing. Actually the input/output communication is not
needed for the full process, because there is a light barrier connected to each
station to indicate following or previous station is in place and the material
detection is on each station where it´s necessary to check the material. But the
binary communication like input/output communication is very important basic
knowledge to understand the next level of communication Fieldbus Technology!
Instructor: Please explain how to find the informations to finish the drawing.
Explain that only one program should be used without any changes to test all
inputs and outputs at the same time.
Planning
Please plan your project step by step first within your team and communicate with
the team of the following station and the previous station if available also to
complete your drawing. Finish the drawing first and then work out which button,
lights or actuators you will use for this project and write it into the drawing.
The time to finish this project should be around 1,5 hour.
2.17 Project
Test the I/O
communication